Files
frontend-miniapp/.superpowers/sdd/task-5-report.md

2.0 KiB

Task 5 Report

Status: DONE_WITH_CONCERNS

Files changed:

  • scripts/check-sgs-hall-poi-adapter.mjs
  • .superpowers/sdd/task-5-report.md
  • .superpowers/sdd/progress.md

Commands run with exact output summary:

  • node scripts/check-sgs-hall-poi-adapter.mjs && pnpm type-check && pnpm lint && pnpm build:h5
    • Exit code: 0
    • Smoke output: SGS hall POI adapter smoke check passed
    • Type-check: vue-tsc --noEmit completed successfully.
    • Lint: eslint "src/**/*.{ts,vue}" completed successfully.
    • H5 build: uni build -p h5 && node scripts/copy-h5-nav-assets.cjs completed successfully.
    • Build copied assets to:
      • dist\build\h5\static\nav-assets
      • dist\build\h5\static\guide-data
      • dist\build\h5\static\sgs-map-sdk
      • dist\build\h5\static\three

Warnings recorded:

  • uni-app update notice for HBuilderX/uni compiler package.
  • Dart Sass deprecation warnings:
    • legacy JS API deprecation.
    • Sass @import deprecation from src\App.vue importing ./styles/variables.scss.

Self-review notes:

  • Public exhibition spaces are classified by Task 2 via a whitelist (exhibition_hall, theater, education_activity, ramp) plus exhibition-name/keyword checks where appropriate.
  • Hall POI creation prefers route-capable entrance anchors only when both entrance coordinates and routeNodeId exist; otherwise it uses preview-only space-center fallback metadata.
  • Task 3 adds repository-level dev diagnostics for failed SGS floor data requests and suspicious hall POI generation/filtering outcomes.
  • Task 4 confirmed ThreeMap did not require code changes for floor-mode visibility because floor mode already uses the full visibility tier.
  • The smoke script now prints the success line required by this task brief.

Concerns:

  • H5 build succeeded but emitted existing Sass deprecation warnings; they are build-tooling/style debt, not blockers for this SGS hall POI plan.
  • src/components/map/ThreeMap.vue has pre-existing uncommitted changes in the main workspace; Task 5 did not include or modify them.